Project Roadmap

Time window shown: Mar–Sep 2025 (months are approximated from the chart positions).

Technology
Supply / Regulations
Infrastructure
Business
Mar
2025
X material scale-up
PoC is working
Apr
2025
Y synthesis stable
modified Z stable
no side reactions
critical reagent list
DCM future regs
fire safety
May
2025
product + throughput
quality requirements
production regs
hygiene perspectives
Jun
2025
continuous flow stable
limitations + optimize
robustness + parts
diversification
logistics options
COGS modeling
Jul
2025
scaling model clear
product is clear
design elements + purchasing
global suppliers
supply limits?
global requirements?
building suits demand
OPEX + CAPEX
Aug
2025
process stable
purification technology
way around if needed
QA/QC procedures
equipment list + purchasing
business case prep
Sep
2025
✓ Show PoC
✓ Supply & regs valid
✓ Infrastructure clear
✓ COGS indicated
Text timeline (copy/paste friendly)

Technology — Show PoC

Chemistry

  • Mar–Apr 2025: X material scale-up
  • Apr–Jun 2025: synthesis of Y material is stable
  • Apr–Jul 2025: synthesis of modified Z materials is stable
  • Jun–Sep 2025: continuous flow method works and is stable

Physics

  • Mar–Apr 2025: PoC is working
  • Apr–Jun 2025: No side effects/side reactions initiated by technology
  • Jun–Aug 2025: define limitations; optimize the method
  • Jul–Sep 2025: scaling model is clear
  • Jul–Aug 2025: product is clear
  • Aug–Sep 2025: process is stable and repeatable

Prototype

  • May–Jul 2025: define product; throughput; scalability model
  • Jun–Jul 2025: robustness; parts availability
  • Jul–Sep 2025: primarily design elements are clear; purchasing
  • Aug–Sep 2025: purification technology

Supply / Regulations — Supply and regulations are valid

Supply

  • Apr–May 2025: critical reagent list
  • May–Jun 2025: critical reagent quality requirements
  • Jun–Jul 2025: diversification
  • Jul–Aug 2025: global suppliers
  • Aug–Sep 2025: way around if necessary

Regulations

  • Apr–May 2025: DCM future regulations
  • May–Jun 2025: Final product production regulations
  • Jul–Aug 2025: any limitations on supply?
  • Jul–Aug 2025: any regulation requirements for product globally?
  • Aug–Sep 2025: Preparation for QA and QC procedures

Infrastructure — Infrastructure needs are clear

  • Apr–May 2025: building fire safety
  • May–Jun 2025: hygiene perspectives
  • Jun–Jul 2025: logistics options
  • Jul–Aug 2025: Building suits the demand
  • Aug–Sep 2025: list of equipment; purchasing

Business metrics — Indicate primarily COGS

  • Jun–Aug 2025: Indicate COGS modeling
  • Jul–Sep 2025: OPEX and CAPEX for next stage
  • Aug–Sep 2025: start preparation of business case